近期可投期刊
IEEE Internet Computing2026-09-15Automated Software Engineering2026-10-01CMC-Computers Materials & Continua2026-10-15IEEE Transactions on Services Computing2026-10-31Computer Standards & Interfaces2026-11-01IEEE Security & Privacy2026-11-01
JOURNAL RADAR / 02

找到机会只是开始,
还要判断是否值得行动

以学校认可目录为边界,优先核验官方 CFP;同时保留主题偏移、 时间、费用、期刊信号和未覆盖范围。

0当前候选与观察项监控日期 · 2026/09/01
0学校目录期刊本轮加载
0主动检查期刊轮换覆盖
0CFP / Collection 页面官方或可信来源
0全量表记录含观察与排除项
覆盖透明度

本轮没有逐页检查全部 0 本期刊。弱相关方向按轮换策略暂缓;ScienceDirect、IEEE 等部分页面可能受命令行访问限制,正式投稿前仍需浏览器复核。

0条匹配机会
01A
HighopenMedium-High

Keeping Humans in the Loop in the AI-Driven Future of Information Security

Information Systems Frontiers

适配方向

EA-OSA/RACE-SOC/SOC human-in-loop alert and incident decision support

查看核验信号、风险与下一步
JCR / IF 公开信号

Springer official Journal metrics: JIF 6.2 (2025); public JCR Q1 signal

中科院公开信号

Public secondary signal: CAS about Zone 3; final graduation material still needs Clarivate/school confirmation

规模 / 速度

Springer: Downloads 1.7M (2025), median first decision 34 days

费用 / 投稿

Springer hybrid/OA; attractive speed signal

风险边界

Springer collection remains open with 2027-01-15 deadline; formal JCR/SCI and fee confirmation still required before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2027-01-15官方页面
02Excluded
ExcludedexpiredMedium-High

Next-Generation Network and Social Media Security: Standards, Protocols, and Applications

Computer Standards & Interfaces

适配方向

ECAS = AEGIS-WL evidence contract/audit traceability + LLMWL API/network-service whitelist governance

查看核验信号、风险与下一步
JCR / IF 公开信号

Public signal: JIF about 4.6 (2025), JCR Q1-like; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 2; formal confirmation required

规模 / 速度

Elsevier/OOIR recent annual volume about 120-130; ScienceDirect CFP signal valid

费用 / 投稿

Elsevier hybrid/OA; deadline extremely close

风险边界

Deadline 2026-08-01 已过期;2026-08-03 未发现官方延期信号,仅保留历史兼容记录。

建议动作

Do not invest new work unless the official ScienceDirect page extends the deadline.

DEADLINE2026-08-01官方页面
03A
Medium-HighopenMedium-High

Security and Resilience of AI Agents in Digital Critical Infrastructures

Computer Standards & Interfaces

适配方向

XTB/RACE-SOC/LLMWL AI-agent resilience, evidence blackboard, response decision

查看核验信号、风险与下一步
JCR / IF 公开信号

Public signal: JIF about 4.6 (2025), JCR Q1-like; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 2; formal confirmation required

规模 / 速度

Elsevier CFP; ScienceDirect command-line access may be blocked by 403

费用 / 投稿

Elsevier hybrid/OA

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-11-01官方页面
04A
Medium-HighopenMedium

Real-World Security: Impact Beyond the Publications

IEEE Security & Privacy

适配方向

BGVD/MDDC real-world validation and engineering impact

查看核验信号、风险与下一步
JCR / IF 公开信号

Public signal: IF about 2.9 (2025), JCR Q2-like; magazine counting needs school confirmation

中科院公开信号

Magazine route CAS/SCI counting unclear; must confirm with school

规模 / 速度

IEEE magazine special issue; article type/volume needs manual check

费用 / 投稿

IEEE magazine route

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-11-01官方页面
05A
Medium-HighopenMedium

Future Internet Systems with LLMs and Agents

IEEE Internet Computing

适配方向

XTB/SOC agent/LLMWL service governance and future Internet systems

查看核验信号、风险与下一步
JCR / IF 公开信号

Public signal: IF about 3.3 (2025), JCR Q2-like; magazine counting needs school confirmation

中科院公开信号

Magazine route CAS/SCI counting unclear; must confirm with school

规模 / 速度

IEEE magazine issue route

费用 / 投稿

IEEE magazine route

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-09-15官方页面
06A
Medium-HighopenHigh

Software Engineering for and with Trustworthy Large Language Models

Automated Software Engineering

适配方向

MDDC/BGVD/LLMWL trustworthy LLM software toolchain

查看核验信号、风险与下一步
JCR / IF 公开信号

Springer/public signal: JIF about 3.9 (2025), JCR Q2

中科院公开信号

Public secondary signal: CAS about Zone 2; formal confirmation required

规模 / 速度

Springer ASE collections; median first decision about 16 days signal

费用 / 投稿

Springer hybrid/OA

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-12-31官方页面
07A
Medium-HighopenHigh

Search-Based Software Engineering in the Era of LLMs and Agentic Systems

Automated Software Engineering

适配方向

MDDC/ARGD/BGVD patch-search, repair decision, verification and agentic search

查看核验信号、风险与下一步
JCR / IF 公开信号

Springer/public signal: JIF about 3.9 (2025), JCR Q2

中科院公开信号

Public secondary signal: CAS about Zone 2; formal confirmation required

规模 / 速度

Springer collection; official page open in July 2026

费用 / 投稿

Springer hybrid/OA

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2027-01-30官方页面
08A
Medium-HighopenHigh

Large Language Models in Service-Oriented Ecosystems Design: Advances and Applications

IEEE Transactions on Services Computing

适配方向

LLMWL/TSC service/API governance

查看核验信号、风险与下一步
JCR / IF 公开信号

Public signal: IF about 6.2 (2025), JCR Q1; formal confirmation required

中科院公开信号

Strong public secondary signal; formal confirmation required

规模 / 速度

High selectivity; IEEE TSC transaction route

费用 / 投稿

IEEE hybrid/OA

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-10-31官方页面
09B
Medium-HighopenLow-Medium

Secure, Safe, and Trustworthy Agentic AI

CMC-Computers Materials & Continua

适配方向

XTB/RACE-SOC/LLMWL agentic reasoning and evidence blackboard

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

High-volume monthly; dense 2025/2026 volumes

费用 / 投稿

OA/APC; likely faster/high-throughput route

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-12-15官方页面
10B
Medium-HighopenLow-Medium

Advanced Intrusion Detection and Intelligent Cybersecurity Systems

CMC-Computers Materials & Continua

适配方向

TRIDENT/NIDS/log security/SOC/CTI

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

Official open SI list; high-volume monthly

费用 / 投稿

OA/APC

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2027-03-15官方页面
11B
Medium-HighopenLow-Medium

AI-Driven Security and Intelligent Architectures for Innovative Internet Services

CMC-Computers Materials & Continua

适配方向

LLMWL/BWL/ECAS service and API security governance

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

Official open SI list; high-volume monthly

费用 / 投稿

OA/APC

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-11-30官方页面
12B
Medium-HighopenLow-Medium

Secure and Trustworthy AI Agents: Foundations, Attacks, and Defenses

CMC-Computers Materials & Continua

适配方向

AI-agent attacks/defenses, evidence blackboard, SOC response governance

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

Official open SI list; high-volume monthly

费用 / 投稿

OA/APC

风险边界

2026-08-03 复核:官方 TechScience 详情页可访问,显示 deadline 2026-12-30;需核验 APC、JCR/SCI 和专题编辑可信度。

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-12-30官方页面
13B
Medium-HighopenLow-Medium

AI Security and Trustworthy Learning in Open and Dynamic Environments

CMC-Computers Materials & Continua

适配方向

XTB/SOC agent trustworthiness, dynamic evidence and adaptive security

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

Official open SI list; high-volume monthly

费用 / 投稿

OA/APC

风险边界

2026-08-03 复核:旧 URL trustworthy-learning 返回 404;官方搜索命中 privacy-preserving-ai-systems,仍显示 deadline 2027-02-20。正式投稿前需保存页面。

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2027-02-20官方页面
14B
Medium-HighopenMedium

Secure, Agentic, Intelligent and Quantum-ready Internet of Things for Civil Protection, Public Safety and Cloud-to-Thing Continuum Systems

Internet of Things

适配方向

IoT/CPS security, SOC agent, cloud-to-thing governance

查看核验信号、风险与下一步
JCR / IF 公开信号

Elsevier public signal: IF about 4.7 (2025), Q2-ish; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 3; needs confirmation

规模 / 速度

Elsevier SI; ScienceDirect command-line may return 403

费用 / 投稿

Elsevier hybrid/OA

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2027-03-30官方页面
15B
MediumopenLow-Medium

Large Language Models as Evaluators in Computing

Discover Computing

适配方向

LLM evaluator/evidence gate for BGVD/MDDC/LLMWL

查看核验信号、风险与下一步
JCR / IF 公开信号

Springer official: JIF 1.9 (2025)

中科院公开信号

New/renamed journal CAS signal unclear; needs formal check

规模 / 速度

Springer: Downloads 765.5k (2025), median first decision 22 days; official collection now shows deadline 31 January 2027

费用 / 投稿

OA/APC

风险边界

官方 Springer 页面今日仍显示 2027-01-31,不是 2026-07-31 截止;但方向偏 LLM evaluator 方法论。

建议动作

作为中期 B 层备选;先写 LLM evaluator protocol fit brief。

DEADLINE2027-01-31官方页面
16B
MediumopenLow

Generative AI Agents: Architectures, Applications, and Intelligent Autonomous Systems

Journal of Internet Technology

适配方向

XTB/SOC agent/API governance, multi-agent security decision

查看核验信号、风险与下一步
JCR / IF 公开信号

JIT official/public signal: JCR 2025 IF 1.2, Q4-like; needs formal check

中科院公开信号

Public secondary signal: low-zone; needs confirmation

规模 / 速度

Official page: tentative publication Q3 2028; slower

费用 / 投稿

Email/system submission; fee needs check

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-11-30官方页面
17B
MediumopenLow-Medium

Advanced and Interpretable Malware Detection in Modern Cyber Environments

CMC-Computers Materials & Continua

适配方向

malware/security dataset direction

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

Official open SI list; high-volume monthly

费用 / 投稿

OA/APC

风险边界

2026-08-03 复核:官方详情页可访问,显示 deadline 2026-12-31;适合 malware/NIDS/SOC backup,不适合 ECAS 主线。

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-12-31官方页面
18Excluded
ExcludedexpiredLow-Medium

Cloud Computing Security and Privacy: Advanced Technologies and Practical Applications

CMC-Computers Materials & Continua

适配方向

LLMWL/API/cloud-service security governance

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

High-volume monthly

费用 / 投稿

OA/APC

风险边界

截止日 2026-07-31 已过期,本轮仅保留兼容记录,不作为候选。

建议动作

不再投入,除非官方延期。

DEADLINE2026-07-31官方页面
19C
MediumopenLow-Medium

Advances in Cybersecurity for Digital Ecosystems

CMC-Computers Materials & Continua

适配方向

digital ecosystem cybersecurity / API governance

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

Official open SI list; high-volume monthly

费用 / 投稿

OA/APC

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-12-31官方页面
20C
MediumopenLow-Medium

Privacy-Preserving AI: Encryption and Differential Privacy

CMC-Computers Materials & Continua

适配方向

LLM security/privacy if actual privacy mechanism exists

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

High-volume monthly

费用 / 投稿

OA/APC

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-09-30官方页面
21C
MediumopenLow-Medium

Advances in IoT Security: Challenges, Solutions, and Future Applications, 2nd Edition

CMC-Computers Materials & Continua

适配方向

IoT/CPS security, intrusion detection

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

High-volume monthly

费用 / 投稿

OA/APC

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-10-20官方页面
22C
MediumopenLow-Medium

The Dual Ledger: AI-Driven Cybersecurity and Blockchain-Verified Artificial Intelligence

CMC-Computers Materials & Continua

适配方向

AI cybersecurity + evidence/provenance only if blockchain verification is natural

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

High-volume monthly

费用 / 投稿

OA/APC

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

C ? provenance watch?

DEADLINE2026-11-15官方页面
23C
MediumopenLow-Medium

AI-Driven Resilient Autonomous Systems: From Distributed Networks to the Future Internet

CMC-Computers Materials & Continua

适配方向

XTB/agent scheduling/resilience if security is foregrounded

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; JCR quartile needs formal check

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

High-volume monthly

费用 / 投稿

OA/APC

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

C ? agent-resilience watch?

DEADLINE2027-04-30官方页面
24C
Lowopen/watchMedium-High

AI-Native Federated Testbeds and Datasets for Next-Generation Communication and Networking Systems

Computer Networks

适配方向

Network-security dataset/testbed route only

查看核验信号、风险与下一步
JCR / IF 公开信号

Elsevier public signal: IF about 5.4 (2025), Q1/Q2-like; needs confirmation

中科院公开信号

Public secondary signal: CAS about Zone 2; needs confirmation

规模 / 速度

Elsevier journal; ScienceDirect command-line may return 403

费用 / 投稿

Elsevier hybrid/OA

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINE2026-10-31官方页面
25Excluded
ExcludedwatchHigh

No confirmed open official security-related special issue found today

Computers & Security

适配方向

All security directions

查看核验信号、风险与下一步
JCR / IF 公开信号

Elsevier public signal: IF about 5.4 (2025); Q1/Q2-like; needs confirmation

中科院公开信号

Strong public secondary signal; needs confirmation

规模 / 速度

High-volume security journal

费用 / 投稿

Elsevier hybrid/OA

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINEN/A官方页面
26Excluded
ExcludedwatchLow

No confirmed open security-related official CFP found today

KSII Transactions on Internet and Information Systems

适配方向

Network/Internet systems

查看核验信号、风险与下一步
JCR / IF 公开信号

Public signal: IF about 1.0-1.2, Q4-like; needs confirmation

中科院公开信号

Low-zone public secondary signal; needs confirmation

规模 / 速度

Historically moderate/high volume

费用 / 投稿

Fee needs check

风险边界

Risk restated in 2026-07-29 report; verify scope, evidence readiness, fee, and formal JCR/SCI status before submission.

建议动作

Prepare fit abstract, evidence ledger, and formal JCR/school confirmation before committing.

DEADLINEN/A官方页面
27B
Medium-HighopenHigh

Intelligent Techniques for Automated Code Review and Software Quality Evaluation

Automated Software Engineering

适配方向

MDDC/BGVD vulnerability patch review, code quality/security verification

查看核验信号、风险与下一步
JCR / IF 公开信号

Springer/public signal: JIF about 3.9 (2025), JCR Q2

中科院公开信号

Public secondary signal: CAS about Zone 2; formal confirmation required

规模 / 速度

Springer official ASE collections list; deadline 2026-10-01

费用 / 投稿

Springer hybrid/OA

风险边界

Security is not the only topic; must frame as automated security code review or quality verification.

建议动作

Write a one-page security-code-review fit brief before investing.

DEADLINE2026-10-01官方页面
28C
MediumopenLow-Medium

From Agents to Agency: Agentic AI for the Artificial Intelligence of Things

CMC-Computers Materials & Continua

适配方向

AIoT agent security/privacy, edge/fog agent evaluation

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; public JCR Q3 signal

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

TechScience CMC high-volume monthly OA journal

费用 / 投稿

OA/APC

风险边界

Security is a subtopic, not the whole CFP; use only as backup.

建议动作

Keep as C-layer survival/watch candidate.

DEADLINE2027-01-31官方页面
29C
MediumopenLow-Medium

Autonomous Decision-Making in AI-Native Networks: Agentic AI, Quantum-Inspired Learning, and Distributed Intelligence

CMC-Computers Materials & Continua

适配方向

XTB/RACE-SOC agent scheduling, network automation security, autonomous decision evidence

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official: SCI 2025 IF 2.4; public JCR Q3 signal

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

TechScience CMC high-volume monthly OA journal

费用 / 投稿

OA/APC

风险边界

Topic is broader AI-native networks; security must be foregrounded to fit.

建议动作

Keep as C-layer watch candidate.

DEADLINE2027-04-30官方页面
30B
Medium-HighopenLow-Medium

AI-Driven Cybersecurity for IoT, Data Science and Computing Systems

Discover Computing

适配方向

IoT cybersecurity, data science security, NIDS/log security, SOC/CTI dataset and AI-driven detection

查看核验信号、风险与下一步
JCR / IF 公开信号

Springer official Discover Computing metrics: JIF 1.9 (2025); public JCR signal below Q2 / new journal route; formal confirmation required

中科院公开信号

New/renamed Springer journal CAS signal unclear; needs school/Clarivate confirmation

规模 / 速度

Springer: Downloads 765.5k (2025), median first decision 22 days; topical collection deadline 28 April 2027

费用 / 投稿

Springer Discover OA/hybrid details need pre-submission check

风险边界

New 2026-08-04 B-layer addition from Springer official collection search. Topic fits security+IoT/data-science, but Discover Computing JCR/CAS graduation strength is weaker than ISF/TSC/ASE and must be formally confirmed.

建议动作

Write a short dataset/security fit brief and confirm APC/JCR/SCI before investing.

DEADLINE2027-04-28官方页面
31B
Medium-HighopenLow-Medium

AI-Empowered Zero Trust Security

CMC-Computers Materials & Continua

适配方向

Zero Trust, identity/access control, API security governance, agent/SOC trust boundary

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official/public signal: SCI, 2025 IF about 2.4; public JCR Q3-like signal; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

TechScience CMC high-volume monthly OA; official detail page shows deadline 31 March 2027

费用 / 投稿

OA/APC; verify current TechScience APC before submission

风险边界

New 2026-08-05 B-layer addition. Strong security-governance fit, but CMC reputation/APC/JCR/CAS must be checked before committing.

建议动作

Prepare a one-page Zero Trust fit brief and decide whether ECAS/LLMWL evidence can be reframed cleanly.

DEADLINE2027-03-31官方页面
32B
MediumopenLow-Medium

Advanced Cryptographic Protocols and Intelligent Security Solutions for Internet of Things

CMC-Computers Materials & Continua

适配方向

IoT security, cryptographic protocols, intelligent security solutions

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official/public signal: SCI, 2025 IF about 2.4; public JCR Q3-like signal; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

TechScience CMC high-volume monthly OA; official detail page shows deadline 31 January 2027

费用 / 投稿

OA/APC; verify current TechScience APC before submission

风险边界

Security-related but more cryptography/IoT than current main evidence; keep as survival backup, not main route.

建议动作

Keep watch; use only if IoT security framing and data are ready.

DEADLINE2027-01-31官方页面
33C
MediumopenLow-Medium

Advances in Quantum Cryptography and Post-Quantum Cryptography

CMC-Computers Materials & Continua

适配方向

Post-quantum/cryptography security only; weak fit to current SOC/API/agent projects

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official/public signal: SCI, 2025 IF about 2.4; public JCR Q3-like signal; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

TechScience CMC high-volume monthly OA; official detail page shows deadline 01 April 2027

费用 / 投稿

OA/APC; verify current TechScience APC before submission

风险边界

Low direct fit; do not spend mainline effort unless a real cryptographic contribution exists.

建议动作

C-layer watch only.

DEADLINE2027-04-01官方页面
34C
MediumopenMedium-High (visualization contribution mandatory)

Visualization for Secure AI and Cyber Systems

IEEE Computer Graphics and Applications

适配方向

SOC visualization, secure AI/cyber systems explainability, analyst decision support

查看核验信号、风险与下一步
JCR / IF 公开信号

Public 2025 JCR-style signal: JIF 1.4, JCR Q3; public 2024 SCIE/Q3 table corroborates; formal school/Clarivate confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 4; current edition and magazine counting require school confirmation

规模 / 速度

IEEE Computer Society CFP page shows submission deadline 4 January 2027 and publication July 2027

费用 / 投稿

IEEE magazine route; article type and fee need check

风险边界

Official IEEE CFP remains open to 2027-01-04. Security fit is strong but visualization cannot be merely illustrative; substantial HCI/visual-analytics design and evaluation are required. School must confirm magazine article counting.

建议动作

Keep as watch; consider only with a polished SOC visual analytics story.

DEADLINE2027-01-04官方页面
35Excluded
Excludedexpired/not-school-listMedium

Key Technologies for Next-Generation Agentic Network Communications

Chinese Journal of Electronics

适配方向

Agentic network communications and security/privacy/trust topics, but deadline has passed

查看核验信号、风险与下一步
JCR / IF 公开信号

Official/public signal: CJE reports SCI/SCIE and IF 4.5, but not enough for school-list eligibility

中科院公开信号

Not evaluated for reminder because school-list match failed and deadline expired

规模 / 速度

CJE official special column page; publication planned January 2027

费用 / 投稿

Submission details via CJE/ScholarOne; no action

风险边界

Not in the current school-recognized ESI computer-science list by title/ISSN/eISSN matching; deadline 2026-05-31 has expired.

建议动作

Do not include in reminder candidates unless school confirms acceptance outside this list and a new/open CFP appears.

DEADLINE2026-05-31官方页面
36B
Medium-HighopenLow-Medium

AI-Driven Data Analytics for Edge Computing Security

CMC-Computers Materials & Continua

适配方向

Edge/IoT intrusion detection, streaming logs, anomaly detection, policy automation and compliance

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official/public signal: SCI, 2025 IF about 2.4; public JCR Q3-like signal; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

TechScience CMC high-volume monthly OA; official special-issue page

费用 / 投稿

OA/APC; verify current TechScience APC before submission

风险边界

New 2026-08-16 official CMC CFP. Strong applied-security fit and long deadline, but CMC reputation, APC and formal JCR/CAS signals require confirmation.

建议动作

Write a one-page fit brief and verify current APC/JCR/CAS before investing.

DEADLINE2027-04-30官方页面
37C
MediumopenLow-Medium

Federated Learning for Multi-agent Systems and Data Mining

CMC-Computers Materials & Continua

适配方向

Multi-agent collaboration, privacy, Byzantine/poisoning robustness and federated anomaly detection

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official/public signal: SCI, 2025 IF about 2.4; public JCR Q3-like signal; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

TechScience CMC high-volume monthly OA; official special-issue page

费用 / 投稿

OA/APC; verify current TechScience APC before submission

风险边界

New 2026-08-16 official CMC CFP. Security is only one subtopic; use as a watch item unless federated multi-agent evidence becomes central.

建议动作

Write a one-page fit brief and verify current APC/JCR/CAS before investing.

DEADLINE2027-05-30官方页面
38A
Medium-HighopenVery High

Trust, Privacy, and Security in Intelligent and Agentic Systems

IEEE Transactions on Dependable and Secure Computing

适配方向

LLM/agent security, tool isolation, least privilege, MCP/protocol security, multi-agent collusion, vulnerability discovery and governance

查看核验信号、风险与下一步
JCR / IF 公开信号

IEEE official 2025 title-list signal: SCIE, JIF 7.0, JCR Q1; newer public 2026 signal reports JIF 6.8/Q1; formal school evidence still required

中科院公开信号

Public secondary signal: CAS about Zone 1/2 depending edition; formal current CAS confirmation required

规模 / 速度

IEEE TDSC bimonthly high-selectivity transaction; annual volume roughly 300-500 articles, verify before submission

费用 / 投稿

IEEE hybrid/OA; traditional route normally avoids mandatory OA APC

风险边界

New 2026-08-18 official CFP. Exceptional scope fit but TDSC is highly selective; case studies and surveys are not accepted, and conference extensions require about 30% substantial new material.

建议动作

Prepare a strict TDSC fit gate: technical novelty, threat model, strong baselines, multi-system evaluation and artifact readiness.

DEADLINE2027-01-15官方页面
39B
Medium-HighopenLow-Medium

Security, Trustworthiness, and Assurance of AI-Enabled Software and Critical Infrastructure Systems

CMC-Computers Materials & Continua

适配方向

AI-enabled software assurance, critical-infrastructure security, trustworthiness, verification, runtime monitoring and governance

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official/public signal: SCI, 2025 IF about 2.4; public JCR Q3-like signal; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

TechScience CMC high-volume monthly OA; official special-issue page

费用 / 投稿

OA/APC; verify current TechScience APC before submission

风险边界

New 2026-08-19 official CMC open-listing candidate. Open the exact detail page and reconfirm scope before submission; CMC APC, reputation and formal JCR/CAS signals still require confirmation.

建议动作

Write a one-page fit brief and verify current APC/JCR/CAS before investing.

DEADLINE2027-04-30官方页面
40B
Medium-HighopenLow-Medium

Deep Learning for Next-Generation Cybersecurity: Architectures, Robustness and Applications

CMC-Computers Materials & Continua

适配方向

Network intrusion detection, malware analysis, adversarial robustness, IoT/ICS security, CTI and explainable detection

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official/public signal: SCI, 2025 IF about 2.4; public JCR Q3-like signal; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

TechScience CMC high-volume monthly OA; official special-issue page

费用 / 投稿

OA/APC; verify current TechScience APC before submission

风险边界

Newly discovered 2026-08-21 on the official CMC CFP page. Deadline is workable only for an experiment-complete manuscript; do not start a broad new model study. Verify APC, current JCR/CAS and school graduation acceptance before submission.

建议动作

Write a one-page fit brief and verify current APC/JCR/CAS before investing.

DEADLINE2026-10-15官方页面
41B
Medium-HighopenLow-Medium

Collaborative Intelligence in Next-Generation Computing: Security, Privacy, and Resilience

CMC-Computers Materials & Continua

适配方向

Secure collaborative AI, multi-agent resilience, collaborative CTI, edge-cloud security, decentralized trust and CPS/IoT security

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official/public signal: SCI, 2025 IF about 2.4; public JCR Q3-like signal; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

TechScience CMC high-volume monthly OA; official special-issue page

费用 / 投稿

OA/APC; verify current TechScience APC before submission

风险边界

Newly discovered 2026-08-24 on the official CMC CFP page. Excellent topic fit and long runway, but CMC is a backup route; verify APC, current JCR/CAS and school graduation acceptance before committing.

建议动作

Write a one-page fit brief and verify current APC/JCR/CAS before investing.

DEADLINE2027-05-31官方页面
42B
Medium-HighopenLow-Medium

AI-Driven Malware Detection and Intelligent Cyber Threat Analytics

CMC-Computers Materials & Continua

适配方向

Malware analysis, explainable security analytics, federated CTI, zero-day detection, automated incident response and IoT/edge defense

查看核验信号、风险与下一步
JCR / IF 公开信号

TechScience official/public signal: SCI, 2025 IF about 2.4; public JCR Q3-like signal; formal confirmation required

中科院公开信号

Public secondary signal: CAS about Zone 4; needs confirmation

规模 / 速度

TechScience CMC high-volume monthly OA; official special-issue page

费用 / 投稿

OA/APC; verify current TechScience APC before submission

风险边界

Newly discovered 2026-08-25 on the official CMC CFP page. Strong applied-security fit and feasible deadline, but the manuscript needs a genuine malware/CTI contribution rather than generic classification. Verify APC, current JCR/CAS and school graduation acceptance.

建议动作

Write a one-page fit brief and verify current APC/JCR/CAS before investing.

DEADLINE2026-12-31官方页面